Rome Project update


The foundation footings have been poured.  The interior perimeter drains have been installed.  Crushed stone was installed for drainage and a base for the basement floor.  The forms for the foundation are being assembled.

IMG_20150306_132305[1]-2 IMG_0934

Comments are closed.